news

The 24th Asian Pet Expo

The 24th Asian Pet Expo

The 24th Asian Pet Expo was held in Shenzhen International Convention and Exhibition Center (Bao'an). Date: 2022.11.03-11.06 Address: No.1 Zhancheng Road, Fuhai Street, Bao'an District, Shenzhen, Guangdong Hiwell Booth No.: Hall 5 5G11 In this exhibition, Hiwell Machinery displayed the snack forming production line and horizontal slicer, providing customers with a variety of so...
Hiwell attened the 2021 China Fisheries & Seafood Expo.

Hiwell attened the 2021 China Fisheries & Seafood Expo.

Hiwell attend the 2021 China Fisheries & Seafood Expo. Automatic forming and coating machines can make the perfect 2D and 3D fish nuggets. Fresh slicer for different angle cutting of fishes. Intelligent portion cutter for required weight cutting. All these machines work on well with the boneless fish and seafood.   ...
CIMIE exhibition

CIMIE exhibition

Hiwell attend the CIMIE exhibition in Qingdao, China. Meat processing machines and line are shown in the booth. Intelligent portion cutter for the fresh meat required weight cutting. Horizontal slicer and intelligent cube dicer form a line for required dimension 3D cube cutting. Automatic forming machine, battering machine and breading machine for middle size factory to make hamburgers, chicken nu...
Introduction to the development direction of crumbing machine

Introduction to the development direction of crumbing machine

crumbing machine is also called breading machine and bread crumbs coating machine. it is used to coat bread crumbs on products, such as the meat patty, beef burgers, vegetable patties and others.  crumbing machine is now have three model, 200mm belt width model, 400mm belt width model, and 600mm belt width model. some customers with bigger capacity need bigger crumbing machine, such as 10...
Matters needing attention when installing and testing the crumbing machine

Matters needing attention when installing and testing the crumbing machine

When installing the crumbing machine, you must pay attention to the following points: The equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts. When installing, pay attention to the verticality of the main body and the horizontal. After installation, check whether the bolts of various parts are loose and whether the main engine compartment door is tighte...